Working at Roof Safety
A type of work at height is
to work on a roof so almost all the control measures which we apply on work at
height will be used with this activity.
First step is preparing the work area at the roof. This will include safe access/egress and edge protection systems needs to install and safety harness is available specifically at the entrance which could be at access/egress point.
Training for the personal related to their job safety and safe system of work to be conducted and ensure it is understood.
Establish exclusion zone to avoid the unauthorized entry to that area with adequate signs.
Rescue team is assigned and rescue arrangements are in place. This is most important thing to consider because if a worker fall and if we don’t have emergency rescue arrangements it will hang for a long time and blood circulation may stop because of body weight to safety harness.
Weather condition needs to be access and ensure it is in limits of working safe conditions.
Now we discuss about the roof hazards and control measures.
Hazards related to roof works:
1. Fragile roof material
is a hazard which needs to be identified with warning tape and signs.
2. Detortion roof
material
3. Unprotected roof
edges
4. Slippery slopes
surfaces
5. Material falling
from roof
6. Person falling
from roof
7. Contact with
overhead cables
8. Manual handling
9. Weather
10. Poorly maintained access equipment
11. Vertical distance from ground
Working at roof
control measures:
1. Carry out roof survey prior
work start
A complete survey of the roof should be carried out
and keep record as well. It should be done by competent personal.
2. Safe means of access and
egress
Access stairs shall be provided where regular access
to roof required. Ladders to be used for those areas where the area is not
frequently used.
3. Permit to work system
Permit to work system for all roof work especially if
roof is fragile
4. Edge protection on roof
Guard rail systems are provided on all edges where
there is risk of falling a personal from 2 meter height or more. As per OSHAD
(Occupational Safety and Health of Abu Dhabi ) guard rails shall be provided a
minimum of 950mm above the walking level. Mid rail should be installed at 470mm
height from the floor level.
5. Properly stacking of material
Store the material adequately and separately so that
it can be retrieved easily and safely when required. It also eliminates the
tripping hazards.
6. Create exclusion zone for
protection of personal working below
Always create the exclusion zones below with warning
signs. But as per my experience it is good practice if we assign a watcher also
for that exclusion zone.
7. Avoid working in worse weather
condition
Do not allow workforce to work on a roof if weather is
not stable (Windy or rainy)
8. Safe lifting of material
For the activities to be performed we need material
for the roof. So be careful while lifting the material. Always lift the
material as per proper procedure and standards.
9. Adequate roof lighting
If the
work will continue till late night or you have the night shift as well then
arrange lights for the whole area. Light standard are discuss in my previous post
but I will add here as well.
Minimum
light required in lux are:
· For
general Construction site, concrete works, excavation, tunnel shaft and
underground area: 53.82 lux.
· For
storage area, walkway, maintenance work, refueling and loading platforms:
53.82 lux.
· And
for shops, plants, electrical and mechanical work areas: 90 lux
10.
Competent worker and supervisors
Competent and suitable supervision required all the
time for such activity.
11.
Protection of falling materials
Install toe boards for the prevention of material
falling. Toe board should be minimum 150mm high.
12.
Access control
Public and visitor entry controlled adequately by
providing barriers and signs. Assign a security personal. For the visitors keeps
record including the host details.
13.
Waste Control
Waste material shall be transported in skips with net
coverings and keep waste segregate with more skips.
14.
Overhead protection
If overhead services are there than adequate clearance
shall be maintained for the services over head.
15.
Secure tools with lanyard
All the tools and equipment which are required for the
activity should be secure with lanyard.